Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
working_groups:radon [2020/01/13 16:43] – external edit 127.0.0.1working_groups:radon [2024/12/26 21:17] (current) aidan
Line 1: Line 1:
 ====== Radon Working Group ====== ====== Radon Working Group ======
-\\ +The working group's page on the BCA Website with its documents and minutes can be found [[https://british-caving.org.uk/about-bca/working-groups/radon/|here]].
  
-**Convenor:** Gethin Thomas+N:B: The Group is currently dormant
  
-**Reports to:** [[council:start|Council]] & [[general_meetings:AGM|Annual General Meetings]]+**Convenor:** //Position Vacant//
  
-**Terms of Reference:** To update the Radon leaflet to reflect current legislation +**Convenor Email Address:** radon@british-caving.org.uk 
 + 
 +**Membership:** Those appointed by the Convenor. 
 + 
 +**Meetings:** Meets as required, usually prior to Council Meetings, arranged by the Convenor. 
 + 
 +**Reports to:** the [[council:start|BCA Council]] at [[council:meetings|Council Meetings]], and annually at [[general_meetings:agm|Annual General Meetings]]. 
 + 
 +The Group is tasked with researching the hazard of Radon in the underground environment and how it can be managed, recorded, and understood. The group maintains the BCA Radon Underground document. 
 + 
 +**Terms of Reference:** (INSERT HERE) 
 + 
 +---- 
 +Updated: 26/12/2024 by Aidan Kuhlmann (Secretary)
  • working_groups/radon.1578933790.txt.gz
  • Last modified: 2020/01/13 16:43
  • by 127.0.0.1